Brayden conducted the sectional replacement of spool and flange for Pin hole leak on a 4” by 400 line at an arrival manifold for Oil and Gas.
Brayden in collaboration with Pollap Nigeria, carried out the laying of underground ESP (Electric Submersible Pump) power cable for well operation.
Brayden carried out inspection, maintenance and fabrication of ruptured 2”(inch) spool for well repair.
Brayden carried out the installation of choke valve at a wellhead and, also carried out the priming of SSSV (Subsurface Safety Valve).
Brayden carried out the Installation of 8”(inch) underground resin water pipe.
Brayden conducted the pipe fitting and modification of recovery pump line.